A typical residential solar PV inspection takes 30-60 minutes, depending on the system size and complexity. Commercial installations may take longer, especially if multiple arrays need surveying. After the inspection, a detailed IEC-compliant report with thermal images and fault analysis is typically delivered within 24 to 48 hours.